Safe site power from day one, placed where trucks, scaffold and excavators won't hit it.
Knock-down rebuilds are a constant across the Northern Beaches, from the flat streets of Dee Why, Collaroy and Narrabeen to steep blocks in Newport, Avalon and Bilgola. Every one needs site power from the first day. A temporary builders supply gives the builder safe power for tools, lighting and amenities until the new home’s permanent supply is connected.
Overhead streets
Most beach streets are overhead. A temporary pole goes up near the frontage and takes a service from the street pole.
Underground streets
Newer estates and some rebuilt streets are underground. A site board connects at the pit.
Steep sites
When a block falls away from the street, the site supply usually sits up at the frontage, protected, with leads run down the site. We position it so excavators, concrete pumps and trucks have room to work.
Bush and trees
On treed blocks, site gear has to be clear of tree protection zones and away from branches that could fall in a storm.
The rebuild sequence
- Permanent disconnection of the old house via power disconnection and reconnection
- Site power installed, often on the same visit
- Demolition and construction run on site power
- The new home connected and the site supply removed
If the new home will have a pool, EV charger or lift, get the three phase power upgrade application in early.
Coastal exposure
Near the surf, salt and wind work on site equipment for months. We use well-sealed enclosures, brace poles against gusts and suggest a check after any big storm.
What we need from you
Site address, builder’s contact, a site plan, single or three phase, start date and the retailer account details.
Safety on site
We install with the required protection and come back if the site supply is damaged. On overhead streets, cranes and concrete pumps must keep clear of street wires; we can advise.
Handover
The permanent supply is connected and certified, and the temporary pole or board comes out so the frontage can be finished.
Where we work
Builders across the beaches book site power with us, including rebuilds in level 2 electricians Dee Why and level 2 electricians Brookvale.
Moving the site supply
As the build progresses, the site supply sometimes has to move: the driveway is poured, scaffold changes or landscaping starts at the frontage. We can relocate it mid-build with a few days’ notice.
Accidental damage
Excavators, trucks and concrete pumps occasionally strike temporary poles or leads. If that happens, stop work nearby, keep people clear and call us to make it safe and check it.
Getting the retailer account right
A site supply can’t be energised without an open electricity account in the builder’s or owner’s name. It’s the most common cause of delays on the day, so set it up early and send us the details.
Small renovations
Not every job needs separate site power. For a kitchen, bathroom or small extension with the family still living in the house, the builder usually runs off the existing supply. We’ll tell you if a temporary supply is worth it.
Single or three phase on site
Most residential sites run on single phase. Big rebuilds with lifts to commission, large compressors or several heavy-tool trades at once may want three phase, especially if the finished home will be three phase anyway.
Rebuilds in flood-prone streets
Near Narrabeen, Dee Why and Manly lagoons, site boards are mounted above likely flood levels and leads are kept off low ground. After heavy rain, have the site supply checked before work resumes.
Joining up the jobs
Most rebuilds need the old house disconnected, site power installed and, at the end, the new home connected. Booking all three with one Level 2 contractor keeps dates and paperwork joined up.
Weekend and early starts
If your crew starts early or works Saturdays, tell us when booking so site power is energised and tested before the first trades arrive on day one.
Book it
Call the Northern Beaches level 2 electricians with your start date.
Updated
What good temporary builders supply looks like
Temporary Builders Supply across the Northern Beaches
Temporary Builders Supply in the Northern Beaches: step by step
- Pick the spotClear of the driveway, excavation and deliveries.
- PaperworkAusgrid notified, retailer account confirmed.
- Install and testTemporary pole or site board connected.
- Remove at handoverPermanent supply live, site supply taken away.
Related services
Power Disconnection and ReconnectionSafe disconnection and reconnection of the network supply for renovations, demolitions, re-roofing and switchboard work.
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.
Temporary Builders Supply questions in the Northern Beaches
Something else on your mind? Call 02 9158 9937 and ask.
Our site slopes steeply away from the street. Where will the site pole go?
Usually near the frontage where trucks can't reach it, with the builder running leads down the site.
Can demolition, disconnection and site power happen on one day?
The disconnection and site power usually can, before the demolition crew starts.
Do we need a retailer account?
Yes. Site power needs an open account before it can be energised.